Grafton, ND – Flood Risk Reduction Moore Engineering successfully completed a flood risk reduction project for the City of Grafton, North Dakota. Read More
Lakeville, MN – Foxborough Stormwater Pond The Moore Engineering's Environmental and Water Resources sectors worked together to complete a stormwater system to... Read More
Redpath Impoundment Flood mitigation project in Traverse and Grant Counties in Minnesota. Moore Engineering proudly served the Bois... Read More
Casselton, ND – Water Tower Replacement Challenge The City of Casselton had a 100,000-gallon multi-column water tower constructed in the early 1920s... Read More
Verndale, MN – Water Treatment Plant & Supply Wells Challenge The city of Verndale, Minnesota had been pulling water from two wells since the 1960s,... Read More
Buffalo/Lynchburg, ND Ditch Retrofit Challenge The Buffalo-Lynchburg Channel had received minor, infrequent maintenance since its construction in 1961. This natural... Read More
Lakeville, MN – Stream/Channel Restoration Challenge Middle Creek, a tributary of the Vermillion River in Dakota County, Minnesota, suffered from issues... Read More
Lake Traverse Water Quality Improvements (TCD 52) Challenge Traverse County Ditch 52 (TCD 52) is an open channel tributary that discharges into Lake... Read More
Upper Maple River Dam, Steele County, ND The Upper Maple River Dam culminates almost 20 years of planning and preparation. It replaced the smaller... Read More
Fargo, ND – El Zagal Levee Challenge El Zagal is a low area in town that required a levee to eliminate temporary... Read More