Moore lands on ENR’s list of Top 500 Design Firms Moore Engineering landed at number 448 on ENR magazine’s list of Top 500 Design Firms for... Read More
Hector, Minn., Wastewater Treatment Plant – 4/25/16 Update The UV disinfection equipment has been completed and was in operation in time for the summertime seasonal disinfection... Read More
New England, N.D. – Water System Improvement: 4/21/16 Update The majority of this project was completed in late 2015. The project still has some seal... Read More
Oberon, N.D., Lift Station Replacement: 4/21/16 Update The proposed lift station structure has been set and the pumps and interior items will be... Read More
Finley, N.D., Industrial Park Sewer & Water Extension: 4/21/16 Update The site is being prepared for paving this spring and is continuing to be monitored due... Read More
Finley, ND Water Tower Replacement: 4/21/16 Update The tower pieces have been welded and inspected for conformity to meet the project specifications. The... Read More
Top 5 Benefits of Geographic Information Systems (GIS) If you haven’t taken the leap into Geographic Information Systems (GIS) yet, maybe you’re wondering why... Read More
12th Avenue North closures begin today in West Fargo Two sections of 12th Avenue North in West Fargo closed today, Monday, April 4, for construction.... Read More
Flint’s drinking water problem could happen elsewhere How to avoid drinking water problems in your city In recent months, tests on the water... Read More
Kurt Lysne named Young Engineer of the Year The F-M Engineers Club has named Kurt Lysne the 2015 Young Engineer of the Year. Lysne... Read More