News

Back to News

Finley, ND Water Tower Replacement: 4/21/16 Update

The tower pieces have been welded and inspected for conformity to meet the project specifications. The contractor is planning to install the reservoir portion of the tower on the top of the stand pipe in the next week or so.  After this, the tower will be painted and connected to the distribution system.  Once the proposed tower was online, the old tower will be removed.

Powered by MHP.SI
Top