Finley, ND Industrial Park Sewer & Water Extension 2/25/16 Update

All sewer and water utilities have been installed on the project and a temporary street section is installed for the winter. In the spring, the contractor will finish the installation of the ditches and driveways, asphalt installation will occur shortly thereafter.  The project should be finished in early spring 2016