News

Back to News

Hector Wastewater Treatment plant: 1/8/16 Update

The new treatment equipment, piping, and valves are being installed within the new process treatment building. This includes the mechanical screening and grit chamber equipment and the sludge thickening equipment.

Also, the existing chlorine contact chamber is being modified and prepared for the UV disinfection equipment which needs to be operational and in service by May 1st, 2016.

Powered by MHP.SI
Top